Villa Park Stormguard RoofingCompare Villa Park roofing quotes without the runaround.Price my roof

Villa Park, CA

Flat roofs do not shed water. They hold it back.

A pitched roof sheds water. A flat roof is a shallow tray that has to be watertight everywhere at once, which is a much harder thing to build.

Describe the flat roofing job

Three questions, then the address. Up to three Villa Park contractors who do this work.

Free · Up to three quotes

Describe the flat roofing job

Three questions, then the address. Up to three Villa Park contractors who do this work.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Nothing is charged and nothing is booked.

Before you let anybody on the roof

The things worth pinning down on a flat roofing job. A contractor who has not raised them has not looked properly.

  • Drain, scupper and overflow provision
  • Which membrane, and how the seams are joined
  • Whether a coating is being sold as a repair
  • How the flat section is flashed into adjoining walls and pitched roofs
  • Whether water ponds anywhere after rain

Coatings can buy a sound roof several years. Coating a failed roof buys you a wet roof with a fresh top coat on it.

Ponding water is the enemy. Anything still sitting there forty-eight hours after rain is a design problem, and tapered insulation is usually the answer.

Single-ply membranes — TPO, PVC, EPDM — are heat-welded or taped at the seams. The seams and the terminations are the whole job.

Locally

Close behind that: shaded slopes that never really dry out. The north side of a house here ages years faster than the south side, and almost every roof gets replaced because of it.

About flat roofing here

Can I stay in the house while it is done?

Most people do. Expect noise from early morning, dust in the attic, and a day where the driveway belongs to the crew.

Are the contractors licensed and insured?

Contractors have to give us their state licence number and proof of liability and workers compensation cover before they can receive requests. You should still ask to see current certificates yourself before work starts — a licence can lapse between checks.

What if the decking is rotten underneath?

Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.

How quickly will someone call?

Usually within the hour during working hours. If you marked the job as an emergency it goes to the front of the queue and is normally picked up faster than that.

Ready for a real number?

It is free, and nothing obliges you to hire anyone.